Challenge:
The main challenge for the Oberon BP project was making the land usable, which required the construction of two walls.
Solution:
To address the side boundary, Morestone installed a new panel wall with a fence on top, providing a sturdy and reliable solution. For the front, a more visually appealing charcoal woodgrain sleeper wall was chosen. This neat, clean, and effective design not only met the structural needs but also enhanced the aesthetic appeal of the site. Once again, Morestone delivered a successful project with precision and quality.