Challenge:
The development required a substantial cut on the southern side, which needed to be retained to make the land usable.
Solution:
Morestone identified a panel wall as the best option for retaining the significant cut. The wall was drafted, manufactured, and installed within three weeks, resulting in a highly satisfied client. The project demonstrated Morestone’s capability to deliver quick and effective solutions for large-scale developments.