Robin Hill Development

Challenge: The development required a substantial cut on the southern side, which needed to be retained to make the land usable. Solution: Morestone identified a panel wall as the best option for retaining the significant cut. The wall was drafted, manufactured, and installed within three weeks, resulting in a highly satisfied client. The project demonstrated […]
Oberon BP

Challenge: The main challenge for the Oberon BP project was making the land usable, which required the construction of two walls. Solution: To address the side boundary, Morestone installed a new panel wall with a fence on top, providing a sturdy and reliable solution. For the front, a more visually appealing charcoal woodgrain sleeper wall […]
Bradwardine Road Precast Panel Wall

Challenge: After a cut and fill process on the property, the cut area needed to be retained. While some retaining was managed using the building walls, additional retaining walls were necessary. Solution: Collaborating closely with the builder, Morestone determined that a precast panel wall was the ideal solution. This choice aligned perfectly with the building […]
Carters Panel Wall

Challenge: To construct a new industrial building behind an existing property, the back of the existing property needed to be retained. Solution: Morestone built a new panel wall at the back of the existing property and installed a new fence on top. This approach ensured the existing property was secure and safe, while preparing the […]
Bullaburra Wall rebuild

Challenge: The old timber wall had reached the end of its lifespan and was at risk of collapsing onto the footpath, posing potential safety hazards. Solution: Morestone removed the failing timber wall and rebuilt it using steel posts and concrete sleepers. The project included traffic control, engineer inspections, and council approvals, ensuring a successful and […]
Georges River National Park

Challenge: The project required the construction of three new toilet blocks using exposed aggregate precast panels. Solution: Morestone manufactured and installed the exposed aggregate panels for the toilet blocks. By working closely with the client and the National Park, the panels were installed on time, allowing other trades to complete the build efficiently. The project […]
AFMH Dairy Farmer

Challenge: With an ever-growing dairy business, AFMH expanded its territory by purchasing property in Ladysmith NSW. On the farm was a large existing shed which needed to be converted into a grain and feed storage facility. Solution: working closely with AFMH reresentatives, Morestone was able to retrofit the concrete panels inside the shed to convert […]
National Parks and Wildlife

Challenge: National Parks needed these assets upgraded: Wentworth Falls Picnic area access walkways and staircases as well as Govett’s Leap cliffside viewing pathway to increase public safety and make accessibility a pleasure to tourists, Solution: With sandstone stairways and cement stabilised granite, combined with many hours of careful and detailed excavation, the Morestone team were […]
Mid-western regional council

Project Requirements Mid-Western Regional Council require a level area for a sports training complex. The project area has hard rock ground conditions that prevented pier and post retaining wall installation. Therefore, an ‘L-Block’ system was required to overcome the ground condition challenges. Morestone Solution Morestone was engaged by Mid-Western Regional Council to prepare the footing […]